HET Beginning-Trimester Report
  First Period of 2020
December 1 - March 31

This report is primarily to summarize the determination of time allocations for the 20-1 trimester.


Commissioning, Engineering, and Guaranteed Time allocations

The HET Board granted the following allocations for the 20-1 period:

In total the Board granted 410 hours of Comm/Eng/GTO time in 20-1.


The Board also granted 17.5 hours of time to the LIGO HET followup project, but this time has not been subtracted from the time available, since the probability of triggering is low (but has very high potential for scientific significance).



Breakdown of how science hours for TACs at each partner were determined:

quantity
Dec
(hrs)
Jan
(hrs)
Feb
(hrs)
Mar
(hrs)
Total
(hrs)
18deg-18deg
399.17
334.00
295.27
289.23
1257.67
Weather-insensitive
engineering time
7.5
7.5
7.5
7.5
30.00
"Operational" time
331.67
326.50
287.77
281.73
1227.69
Weather loss frac. 0.346
0.341
0.319
0.331

Efficiency loss frac.
(align+PRs)
0.094
0.094
0.097
0.094

"Clear science" time
196.52
194.94
176.96
170.76
739.18
Com/Eng/GTO time




380.00
"Allowed" hours
given to TACs
for science




359.18

(note that HETDEX's allocation of 250h was amended to 220h in January 2020, and HETDEX returned 30h to be allocated to the TACs as of January 15, 2020)

Original hours allowed for each TAC as of November 1, 2019:

Partner
Share
Notes
Total hours
allowed
Goettingen
0.0085

3.1
Munich
0.0590

21.3
PSU
0.2568
time trade: 92.24 - 4.75
87.6
UT
0.6757
time trade: 242.70 + 4.75
247.5

Amended hours allowed for each TAC after HETDEX returned 30h, as of January 15 2020:

Partner
Total hours
allowed
Goettingen
3.4
Munich
22.9
PSU
95.3
UT
268.9



Note that TACs may allocate up to 8.3% at P0, 25% at P1, 33.3% at P2 and 33.3% at P3. P4 allocations are not restricted. GTO and engineering time are assigned by the HET board and not from this formula.






SJ, Feb 24 2020