Updates on recent changes/improvements:
Commissioning, Engineering, and Guaranteed Time allocations
The HET Board granted the following
allocations for the 20-3 period:
In total the Board granted 267 hours of
Comm/Eng/GTO time in 20-3. (252h on-sky and 15h for HET
operations)
Breakdown of how science hours for TACs
at each partner were determined:
quantity |
Aug (hrs) |
Sep (hrs) |
Oct (hrs) |
Nov (hrs) |
Total (hrs) |
18deg-18deg |
243.93 |
268.10 |
306.58 |
318.17 |
1136.78 |
Weather-insensitive engineering time |
5 |
5 |
5 |
0 | 15.00 |
"Operational" time |
238.93 |
263.10 |
301.58 |
318.17 |
1121.78 |
Weather loss frac. | 0.416 |
0.504 |
0.290 |
0.245 |
|
Efficiency loss frac. (align+PRs) |
0.094 |
0.098 |
0.094 |
0.094 |
|
"Clear science" time |
126.42 |
117.71 |
194.00 |
217.64 |
655.76 |
Com/Eng/GTO time |
252.00 |
||||
"Allowed" hours given to TACs for science |
403.76 |
Hours allowed for each TAC as determined June
8, 2020:
Partner |
Share |
Notes |
Total hours allowed |
Allocated
as of Aug 1
|
Goettingen |
0.0085 |
3.4 |
3.4 |
|
Munich |
0.0590 |
23.8 |
23.8 |
|
PSU |
0.2568 |
time trade: 103.69 - 4.75 |
98.9 |
93.9 |
UT |
0.6757 |
time trade: 272.82 + 4.75 |
277.6 |
276.9 |
SJ, 1 Aug 2020