|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Stack Data | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Stop | ee50 | ee80 | Hefi Focus | Mars Focus | Outside Temp | Dome Temp | Truss Temp | Wind Direction | Wind Speed | Stack Type | |
| 01:42 | First of Night | |||||||||||
| ↪ Comments | Gusts causing tower to shake so much I may not be able to get a correct alignment and stack (never seen it shake this bad). DMI reading also inconsistant (probably due to the tower shake). Unable to line up spots so could not finish the stack. | |||||||||||
| Problem Reports | ||||
|---|---|---|---|---|
| PR Number | Times | Time Lost | Description | Response |
| 4374 | 02:05-03:31 | 01:26 | Abnormal amount of CCAS tower shake while trying to stack. | Called: George, Herman, Matthew George told me to call Herman. Matthew confirmed that this was abnormal. Herman climbed the tower and noted that a tool box had fallen between the two towers closing the gap between them. After the tool box was removed the tower was back to normal. |
| 1696 | 01:28-01:28 | 00:00 | Took out sensor 85-3 for LTRSE | |
| 4375 | 04:09-06:47 | 02:38 | DMI stage not coming back out on its own. Y stage not able to adjust any more to line up the spots. Hitting the lower limit. | Called: George, Herman,Mike Mike said that he doesn't believe this to be caused by anything software related. Herman and George came up and looked at the Y stage problems. After looking at the Y stage Herman stayed up to fix the DMI stage issues. |
| Ops Comments | none |
|---|
| TO Comments | Windy at beginning of the night. Many problems encountered while trying to stack. After it was decided that the Y stage could not be adjusted enough to achieve a good stack we resorted to the test that could be done with a closed dome. |
|---|
| RA Comments | Started night with dwfs08,CWFS,PV twilight images (between high wind dome closure states, high wind remains a problem). Numerouse problems with CCAS hardware. Not able to stack. Did closed dome testing of Ra,Dec probe movements. |
|---|
| Observations | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| File | Target/QID | Exp Start | Exposure | Overhead | Program | Instrument Configuration | Data Type | IQ | Dimm | SkySBrt | Skytrans | SNR | Comments | Charge | |