| Problem Reports |
|---|
| PR Number | Times | Time Lost | Description | Response |
|---|
| 4065 | 03:43-03:52 | 00:09 | LX torque limiter slip. Heard it on the speakers; sounded like a sudden rev on an engine. LX Trq light turned red on Tracker Operations panel in ControlDesk. The recovery procedure where fault processing is put into Eng.Mode, the skew is cleared by moving to current ITF position via TCS GUI, and then the position is increased in X by increments of 10mm at fast slew speed-- that all worked just fine. | |
| 4400 | 06:03-07:44 | 01:41 | Y Slew Brake P Switch error. Attempted to release ALL brakes manually through control desk and was not able to get any of them to release. George and Brent came up and determined that the air hose in the cable wrap may have been pinched, because the problem resolved itself immediately after a structure move. | Called: George Damm, Brent Buetow
|
| 4287 | 08:38-08:40 | 00:02 | PAS crashed after we set up on target. | Shut down and restarted everything. |
| 4401 | 05:00-05:00 | 00:00 | Brent Buetow is not in staff list and cannot be entered via on site personnel select boxes in TO night report. | |