| 4264 | 09:29-09:31 | 00:02 | go_next command doesn't turn green, or red, and nothing happens, and tcs_server is not defunct or maxing out cpu according to checks on htcs. There are no faults. Nothing seems frozen. TCS/GUI were idle for hours before attempting to move to target. Shutdown and restarted everything. Index time 55760 | |
| 4261 | 06:30-07:30 | 01:00 | Mirrors in Banks 3 and 8 were not being adjusted by SCS. Attempting to move segments in those banks manually caused error in attached screenshot to appear, then a notice saying that communications with the SCS server had been lost. SCS GUI would then close.
Had to reboot scs computer from terminal to fix problem. It worked fine after that. | |
| 4260 | 05:30-06:30 | 01:00 | On AOA view, mirrors 87, 86, 57, 1, 19, 3, 9, 2 were all donuts that required > 50 positive piston adjustment to fix, some > 100. Even at cold temperatures I've never seen anything like this before. Occurred at ~1C truss temp. | |
| 4263 | 07:30-08:00 | 00:30 | Segment 1 i lever was at mechanical lower limit. Was unable to stack segment 1 until Jerry adjusted the limit. | |
| 4262 | 04:00-04:15 | 00:15 | Checking Process Images in CWFS camera tab is very much not a good idea right now. TCS GUI will become nonresponsive, and killing/restoring GUI means PAS errors will remain. (6 PAS async command sender error windows popped up for me upon restarting GUI.) | |
| 4265 | 05:00-05:00 | 00:00 | Fowlkes external 0.3um dust sensor is ~2 million above both Locke sensor and internal sensor with dome open, all night long. | |