VIRUS Spectrograph
NOTE: The VIRUS commissioning team is maintaining additional documentation so please check: http://www.as.utexas.edu/~gebhardt/virususe/virususe.html
NOTE: The VIRUS parallel data working group is maintaining a wiki with important and useful information about accessing the parallel data:
https://luna.mpe.mpg.de/wikivirusparallel/index.php/Main_Page (U: parallel P: VirussuriV)
Developments | Links |
Mar 2019 - the position of the IFU fibers on the sky was redistributed.
Oct 31 2019 - there are now 59 IFUs installed
Jun 1 2020 - there are now 71 IFUs installed - see the layout page for updated configuration details.
Aug 2021 - there are 78 units installed and most are operational
Feb 2022 - power supply issues caused VIRUS to be fully offline Feb 22-24 and with only 40/78 units from Feb 25-26. Normal operations resumed Feb 27th (all dates UT).
|
|
See this reference for complete technical details about VIRUS:
Hill et al. 2021 - http://arxiv.org/abs/2110.03843
Last updated: Tue, 22 Nov 2022 16:24:38 +0000 stevenj
|